Fichtner Projects

Established in 1922 by Martin Fichtner, the company has evolved from a regionally focused engineering office into Germany’s largest independent firm of consulting engineers, and it is now among the front-runners internationally.

The Fichtner Group with its subsidiaries and associated companies has a staff strength of more than 1800 worldwide. The Stuttgart Home Office accounts for over 450 of these, comprising mainly experienced engineers, economists and management consultants covering a wide variety of specialist fields.

For public- and private-sector infrastructure service providers Fichtner offer comprehensive and interdisciplinary consultancy support, with their key area of activity concerned with central utilities infrastructure. No other enterprise offers their combination of engineering and consultancy, as needed for realizing large-scale projects, with classical management consultancy services.

Fichtner is headed by a management team which, with its chairman, bears overall responsibility. The body supervising their management is an advisory board, elected by the shareholders, made up of individuals of high standing within their business sector. Alongside its oversight function, it provides advice and support to management in all important matters relating to corporate policy and planning.

In conjunction with Spinwell Global, Fichtner are currently recruiting for the following projects:

Name Long Phu 1 - Coal Fired Thermal Power Plant  
Type 2 x 600 MW  
     
Role Owner's Engineer
   
Location The Long Phu 1 power plant is located in the Long Phu power complex area at Thanh Due and Loi Due hamlets, Long Due commune, Long Phu district, Soc Trang Province. It is on the right bank of Hau River, about 1.3km form Dai Ngai estuary and 20km form the East of Soc Trang Township. Project location is about 140 km from the Southwest of Ho Chi Minh city (230 km road).
   
Plant Description 2 x 600 MW coal fired Power plant, super critical, PC technology, Wet FGD, Bituminous and sub - bituminous coal.
   
Duration Commercial operation date of Unit 1: 5/2015.
Commercial operation date of Unit 2: 9/2015.
   

Name Nhon Trach 2 - Combined Cycle Power Plant  
Type 750 MW  
     
Role Contractor's Engineer
   
Location The Nhon Trach 2 Power Plant is located at the East of Nhon Trach Power Center of Ong Keo Industrial zone (IZ). Location of the project is at confluence of Dong Tranh – Long Tau rivers belonging ward 3, Tay Khanh hamlet, Phuoc Khanh commune, Nhon Trach district, Dong Nai province. It is 23km Southeast far from Ho Chi Minh city and far about 19.5km South – West from National Road No. 51 as the crow flies.

Phuoc Khanh commune, Nhon Trach district which is located in the Southwest of Dong Nai province, is bounded as follows:
  • On the North by Long Thanh district (Dong Nai province), district 2 and 9 of Ho Chi Minh city;
  • On the South and West by Nha Be district, Ho Chi Minh city;
  • On the East by Long Thanh district (Dong Nai province) and Tan Thanh district (Ba Ria – Vung Tau)
  •    
    Plant Description Combined Cycle Power Plant 750 MW with Natural Gas from Nam Con Son basin.
       

    Name Duyen Hai 1 - Coal Fired Thermal Power Plant  
    Type 2 x 600 MW  
         
    Role Owners Engineer
       
    Location The Duyen Hai 1 Thermal Power Plant Project is located in the Duyen Hai Power Generation Complex of Duyen Hai District, Tra Vinh Province.
       
    Plant Description 2 x 600 MW coal fired Power plant, PC technology, Wet FGD, Local Anthracite coal.
       
    Duration Operational between 2014-2015.
       

    Name Thai Binh 1 - Coal Fired Thermal Power Plant  
    Type 2 x 300 MW  
         
    Role Owners Engineer
       
    Location Thai Binh 1 Thermal Power Plant is located at My Loc commune, Thai Thuy district, Thai Binh province.

    Location is on the South of My Loc commune, on the left bank of Tra Ly river, about 3 km far from Tra Ly river mouth towards West, about 20 km far from Thai Binh city towards East, about 170 km far from Ha Noi city towards South-East.
       
    Plant Description 2 x 600 MW coal fired Power plant, PC technology, Wet FGD, Local Anthracite Coal.
       
    Duration Operational 2015
       

    Name Thai Binh 2 - Coal Fired Thermal Power Plant  
    Type 2 x 600 MW  
         
    Role Owners Engineer
       
    Location Thai Binh 2 is located at My Loc commune, Thai Thuy district, Thai Binh province with geographical position:

    Site elevation (to top of soil platform) is 4.5m above mean sea level.

    The project site is on the south of My Loc commune, on the left ofTra Ly Ri ver, 3km from Tra Ly River gate to the west, 20km from Thai Binh city to the East, 170km from Ha Noi to the South East.
       
    Plant Description 2 x 600 MW coal fired Power plant, super critical, PC technology, Wet FGD, local Anthracite Coal
       
    Duration Operational 2014
       

    Name Thang Long I - Coal Fired Thermal Power Plant  
    Type 2 x 300 MW  
         
    Role Owners Engineer
       
    Location The Thang Long I, 300MW coal fired thermal power plant Project (hereafter called Project) is located at Le Loi commune, Hoanh Bo, Quang Ninh Province. The Project Site is approximately 10 km from Ha Long bay. Total area of the Project is approximately 14ha.
       
    Plant Desription 2 x 300 MW Coal fired power plant, CFB technology, subcritical, local Anthracite coal.
       
    Duration Operational 2014
       

    Name Vung Ang 1 - Coal Fired Thermal Power Plant  
    Type 2 x 600 MW  
         
    Role Contractors Engineer
       
    Location The construction location of the power plant is on the east side of Hai Phong village, Ky Loi commune, Ky Anh district, Ha Tinh province, within Vung Ang Port - industrial zone, 8 to 9 km away from the National Highway No.1 A.

    The plant area is bordered by Bo Can mountain range of 85m-300m elevation above sea level in the South, Cao Vong mountain in the Southwest, and Sang Mountain - Dung cape ( 40m elevation) in the Northwest and Eastern Sea in the North. Most mountainous slopes are segmented by stream branches of the Bui Seo stream from the West to the East, formning denuded mountainous slopes and causing poor plantation.

    The location is adjacent to Hai Phong village, on a sloped sandy ground and casuarina planted sandy yards and local burial-ground in the North.
       
    Plant Description 2 x 600 MW coal fired power plant, PC boiler technology, sub critical, local Anthracite coal, seawater FGD.
       
    Duration Unit 1 of the Vung Ang 1 plant is expected to be put into operation in the third quarter of 2012, Unit 2 in the first quarter of 2013.